Skip to content
Failed

#21211 (Mar 23, 2026, 11:51:58 AM)

Started 9 hr 41 min ago
Took 2 min 15 sec on build5-deb12build-ansible

Started by upstream project gerrit-osmo-uecups build number 63
originally caused by:

This run spent:

  • 6 sec waiting;
  • 2 min 15 sec build duration;
  • 2 min 21 sec total from scheduled to completion.
Revision: 7f3e2d41571df20313dfab4a6b598cd095e5f760
Repository: $GERRIT_REPO_URL
  • master
Implement logic to perform IPv6 SLAAC in GTPU tunnel

The IPv6 SLAAC prcoedure is not yet triggered in this patch; it will be
triggered by cups_client's new command in follow-up patch.

Depends: libosmo-netif.git Change-Id I78ec7270c717af0a1b8ffd9398cd69ea7a0dbee2
Change-Id: I837a4d7ec7c134412ab4a2e09909670e81ecbeea
Pau Espin Pedrol at