Skip to content
Success

#20193 (Nov 25, 2024, 3:32:59 PM)

Started 4 days 3 hr ago
Took 1.8 sec on build2-deb10build-ansible

Started by upstream project gerrit-osmo-ggsn build number 177
originally caused by:

This run spent:

  • 2 min 40 sec waiting;
  • 1.8 sec build duration;
  • 2 min 42 sec total from scheduled to completion.
Revision: 839c2b9c84f608a04c4ae7587fe40cc642444789
Repository: $GERRIT_REPO_URL
  • master
Changes
  1. gtp: Make peer addr const in gtp_req/gtp_resp (details)