Skip to content
Success

#27081 (Feb 24, 2026, 2:40:56 PM)

Started 21 hr ago
Took 5.5 sec on build5-deb12build-ansible

Started by upstream project gerrit-osmo-asf4-dfu build number 103
originally caused by:

This run spent:

  • 7 sec waiting;
  • 5.5 sec build duration;
  • 12 sec total from scheduled to completion.
Revision: bf031a1633ae6e20c38883406b6cabd28ac852d0
Repository: $GERRIT_REPO_URL
  • master
dfu: make dfu_state/dfu_status volatile

Both variable might be changed from IRQ and from main loop.

Change-Id: I7ad5255064917c203cebe5ab54a5d457baa2f5ed
lynxis at