Skip to content
Success

BTS_MODEL=trx,FIRMWARE_VERSION=master,0,default,raspbian (Nov 8, 2024, 9:27:14 PM)

Started 4 days 3 hr ago
Took 3 min 32 sec on lx2-raspbian11build-ansible

Started by upstream project gerrit-osmo-bts-build build number 977
originally caused by:

This run spent:

  • 2 ms waiting;
  • 3 min 32 sec build duration;
  • 3 min 32 sec total from scheduled to completion.
Revision: 6f9ccafde4ff95da2aa8a009f986da679a388d47
Repository: ssh://jenkins@gerrit.osmocom.org:29418/osmo-bts
  • master
Changes
  1. osmo-bts-trx: fix scheduling of DL FACCH/H for TCH/H4.8 and TCH/H2.4 (details)