Skip to content
Success

--disable-gtp-linux,1,a3=default,a4=default,osmocom-gerrit (Oct 22, 2024, 5:45:57 PM)

Started 15 days ago
Took 45 sec on build4-deb12build-ansible

Started by upstream project gerrit-osmo-ggsn-build build number 153
originally caused by:

This run spent:

  • 51 sec waiting;
  • 45 sec build duration;
  • 1 min 37 sec total from scheduled to completion.
Revision: f92d875119f3550aeab11eccd74b3d46f0906d5b
Repository: ssh://jenkins@gerrit.osmocom.org:29418/osmo-ggsn
  • master
Changes
  1. ggsn: apply configured APN MTU to tun (details)