Skip to content
Success

--disable-iu,0,a3=default,a4=default,osmocom-gerrit (Sep 23, 2024, 3:30:57 PM)

Started 26 days ago
Took 2 min 54 sec on build2-deb11build-ansible

Started by upstream project gerrit-osmo-sgsn-build build number 279
originally caused by:

This run spent:

  • 3 min 28 sec waiting;
  • 2 min 54 sec build duration;
  • 6 min 23 sec total from scheduled to completion.
Revision: 93eb11821bc679a741825f1e6236366ddae4677b
Repository: ssh://jenkins@gerrit.osmocom.org:29418/osmo-sgsn
  • master
Changes
  1. Add Routing Areas (details)