Skip to content
Success

--disable-iu,0,a3=default,a4=default,osmocom-gerrit (Feb 20, 2025, 2:41:47 PM)

Started 7 hr 2 min ago
Took 2 min 18 sec on build4-deb12build-ansible

Started by upstream project gerrit-osmo-sgsn-build build number 429
originally caused by:

This run spent:

  • 1 min 10 sec waiting;
  • 2 min 18 sec build duration;
  • 3 min 28 sec total from scheduled to completion.
Revision: 568b1761df946690a372135266b846419afc804d
Repository: ssh://jenkins@gerrit.osmocom.org:29418/osmo-sgsn
  • master
Changes
  1. libvlr: squash libvlr reworks (details)