Skip to content
Success

a1=default,a2=default,a3=default,a4=default,osmocom-master (Oct 10, 2024, 3:01:10 PM)

Started 9 hr 18 min ago
Took 1 min 42 sec on build4-deb12build-ansible

Started by upstream project master-libosmo-sigtran build number 130
originally caused by:

This run spent:

  • 2 ms waiting;
  • 1 min 42 sec build duration;
  • 1 min 42 sec total from scheduled to completion.
Revision: 48be524ca144fbd3c18151c31673bbc829ab561b
Repository: https://gerrit.osmocom.org/libosmo-sigtran
  • origin/master
Changes
  1. tests/vty: Show bug inserting routes with different priority (details)