Skip to content
Success

#29058 (Feb 2, 2026, 12:50:12 AM)

Started 8 hr 21 min ago
Took 2 min 10 sec on built-in

Started by upstream project master-osmo-mgw build number 13560
originally caused by:

This run spent:

  • 7.5 sec waiting;
  • 2 min 10 sec build duration;
  • 2 min 18 sec total from scheduled to completion.
Revision: 3ee6631738b6944914005df450b6eda50e8e8fa4
Repository: https://gerrit.osmocom.org/osmo-bsc
  • origin/master

Configurations