Skip to content
Success

--disable-gtp-linux,1,a3=default,a4=default,osmocom-master (Oct 22, 2024, 6:56:09 PM)

Started 14 days ago
Took 1 min 10 sec on host2-deb11build-ansible

Started by upstream project master-osmo-ggsn build number 9128
originally caused by:

This run spent:

  • 2 ms waiting;
  • 1 min 10 sec build duration;
  • 1 min 10 sec total from scheduled to completion.
Revision: d44bf6fd7379b4f066d0229b15732e77319b37e9
Repository: https://gerrit.osmocom.org/osmo-ggsn
  • origin/master
Changes
  1. ggsn: Use osmo_netdev_addaddr() libosmocore API (details)
  2. ggsn: apply configured APN MTU to tun (details)
  3. doc: Fix typo in user manual (details)
  4. doc: Remove reference to non longer existing osmo-ggsn.init (details)
  5. doc: Fix typo: wrong interface named (details)