Skip to content
Success

#54156 (Aug 25, 2025, 5:00:05 PM)

Started 8 days 19 hr ago
Took 3 min 23 sec on build5-deb12build-ansible

Started by upstream project master-osmo-sgsn build number 54156
originally caused by:

This run spent:

  • 2 ms waiting;
  • 3 min 23 sec build duration;
  • 3 min 23 sec total from scheduled to completion.
Revision: 02fbdb59c2a51ca0c3df27e36ed18cf8a78bad2f
Repository: https://gerrit.osmocom.org/osmo-sgsn
  • origin/master
Changes
  1. [1/4] Adopt iu_client from osmo-iuh (details)
  2. [2/4] iu_client: rename symbols to prevent clashes with libosmo-ranap (details)
  3. [3/4] iu_client: hide symbols to prevent clashes (details)
  4. [4/4] iu_client: start using adopted iu_client (details)
  5. Re-introduce Iu/UTRAN support (details)