Skip to content
Started 2 hr 14 min ago
Took 3 min 2 sec on build2-deb11build-ansible

NFTABLES=1,PFCP=1,WITH_MANUALS=1,default,osmocom-master (Jun 27, 2024, 12:52:50 AM)

No changes.

Started by upstream project master-osmo-hnbgw build number 9118
originally caused by:

This run spent:

  • 2 ms waiting;
  • 3 min 2 sec build duration;
  • 3 min 2 sec total from scheduled to completion.
Revision: 3ef65760ff5782d981c90839de4a5bede63b42a5
Repository: https://gerrit.osmocom.org/osmo-hnbgw
  • origin/master