Failed
trial-ttcn3_bts_tests:sysmo.ttcn3_bts_tests.TC_rsl_ms_pwr_ctrl (from Titan)
Failing for the past 3 builds
(Since Unstable )
Stacktrace
Power level in L1 header does not match the signaled (RSL) power level. BTS_Tests.ttcn:7203 BTS_Tests control part BTS_Tests.ttcn:3184 TC_rsl_ms_pwr_ctrl testcase