Skip to content
Success

#52121 (Jan 30, 2025, 1:30:06 PM)

Started 6 hr 22 min ago
Took 2 min 13 sec on build4-deb12build-ansible

Started by upstream project master-osmo-sgsn build number 52121
originally caused by:

This run spent:

  • 2 ms waiting;
  • 2 min 13 sec build duration;
  • 2 min 13 sec total from scheduled to completion.
Revision: 028c299bb2bc3ec17b2e34dd0e2ddd13b1975e6e
Repository: https://gerrit.osmocom.org/osmo-sgsn
  • origin/master
Changes
  1. GMM: rework PDP context status (details)
  2. Refactor mmctx_is_r99 into mmctx.c (details)
  3. gprs_ms_net_cap_gea_mask(): protect against empty MS Network (details)
  4. Add include prefix for all libgtp related includes (details)