Skip to content
Success

BTS_MODEL=trx,FIRMWARE_VERSION=master,0,default,raspbian (Sep 30, 2024, 12:36:36 PM)

Started 7 hr 43 min ago
Took 3 min 19 sec on lx2-raspbian11build-ansible

Started by upstream project gerrit-osmo-bts-build build number 938
originally caused by:

This run spent:

  • 3 ms waiting;
  • 3 min 19 sec build duration;
  • 3 min 19 sec total from scheduled to completion.
Revision: 02ecc352a1928fedc6bda3c56bb6501bcb73b1ea
Repository: ssh://jenkins@gerrit.osmocom.org:29418/osmo-bts
  • master
Changes
  1. gsmtap_csd_rlp_process(): fix frame reassembly for TCH/F4.8 (details)