Skip to content
Failed

--disable-iu,0,a3=default,a4=default,osmocom-gerrit (Feb 20, 2025, 2:41:47 PM)

Started 1 day 3 hr ago
Took 55 sec on build5-deb12build-ansible

Started by upstream project gerrit-osmo-sgsn-build build number 427
originally caused by:

This run spent:

  • 38 sec waiting;
  • 55 sec build duration;
  • 1 min 33 sec total from scheduled to completion.
Revision: 4ad6ac787813d3213859603effe4cb5ebfae4066
Repository: ssh://jenkins@gerrit.osmocom.org:29418/osmo-sgsn
  • master
Changes
  1. Add Gn support to allow MME->SGSN, SGSN->MME cell reselection (details)