Skip to content
Success

a1=default,a2=default,a3=default,a4=default,osmocom-master (Dec 3, 2024, 10:05:09 AM)

Started 8 hr 14 min ago
Took 2 min 12 sec on build2-deb11build-ansible

Started by upstream project master-osmocom-bb build number 7120
originally caused by:

This run spent:

  • 3 ms waiting;
  • 2 min 12 sec build duration;
  • 2 min 12 sec total from scheduled to completion.
Revision: f9782c6609ff43635e9e986e011f902a98abea0e
Repository: https://gerrit.osmocom.org/osmocom-bb
  • origin/master
Changes
  1. debian: prepare for more subpackages (details)
  2. debian: add subpackage osmocom-bb-trxcon (details)
  3. debian: add subpackage osmocom-bb-virtphy (details)
  4. debian: add subpackage osmocom-bb-trx-toolkit (details)