Skip to content
Failed

#214 (Jan 12, 2025, 8:05:26 PM)

Started 6 hr 14 min ago
Took 51 sec on built-in

Started by upstream project gerrit-osmo-ggsn build number 216
originally caused by:

This run spent:

  • 6.8 sec waiting;
  • 51 sec build duration;
  • 58 sec total from scheduled to completion.
Revision: e49d33cca92122f894c5b125429e4841365aa113
Repository: ssh://jenkins@gerrit.osmocom.org:29418/osmo-ggsn
  • master
Configuration Matrix--enable-gtp-linux--disable-gtp-linux
1
Not run
0
Not run