Skip to content
Failed

#413 (Feb 16, 2025, 9:37:27 PM)

Started 3 days 11 hr ago
Took 2 min 39 sec on build4-deb12build-ansible

Started by upstream project gerrit-osmo-sgsn-build build number 413
originally caused by:

This run spent:

  • 1 min 37 sec waiting;
  • 2 min 39 sec build duration;
  • 4 min 17 sec total from scheduled to completion.
Revision: f827a808e92f9029b3f89ecfd0a909a694736181
Repository: ssh://jenkins@gerrit.osmocom.org:29418/osmo-sgsn
  • master
Changes
  1. add libvlr based on MSC commit 25362cc295036a4671804db9003c3d22a88309d2 (details)