Skip to content
Success

--disable-iu,0,a3=default,a4=default,osmocom-master (Dec 10, 2024, 2:50:09 PM)

Started 4 days 9 hr ago
Took 2 min 14 sec on build4-deb12build-ansible

Started by upstream project master-osmo-sgsn build number 51651
originally caused by:

This run spent:

  • 3 ms waiting;
  • 2 min 14 sec build duration;
  • 2 min 14 sec total from scheduled to completion.
Revision: 7a45b5748582594d8113c24d7de03dd4740ccb4e
Repository: https://gerrit.osmocom.org/osmo-sgsn
  • origin/master
Changes
  1. sgsn_vty: Drop unneeded use of abis/ipa.h header (details)