Skip to content

Failed

trial-ttcn3_bts_tests:sysmo.ttcn3_bts_tests.TC_rsl_ms_pwr_ctrl (from Titan)

Failing for the past 4 builds (Since #2720 )
Took 1 min 21 sec.

Stacktrace

Power level in L1 header does not match the signaled (RSL) power level.
      BTS_Tests.ttcn:7119 BTS_Tests control part
      BTS_Tests.ttcn:3138 TC_rsl_ms_pwr_ctrl testcase