Skip to content

Failed

trial-ttcn3_bts_tests:sysmo.ttcn3_bts_tests.TC_rsl_ms_pwr_ctrl (from Titan)

Failing for the past 1 build (Since #2725 )
Took 1 min 24 sec.

Stacktrace

Power level in L1 header does not match the signaled (RSL) power level.
      BTS_Tests.ttcn:7200 BTS_Tests control part
      BTS_Tests.ttcn:3155 TC_rsl_ms_pwr_ctrl testcase