Skip to content
Success

#9504 (Feb 12, 2025, 1:21:10 PM)

Started 15 min ago
Took 51 sec on build5-deb12build-ansible

Started by upstream project master-osmo-ggsn build number 9504
originally caused by:

This run spent:

  • 2 ms waiting;
  • 51 sec build duration;
  • 51 sec total from scheduled to completion.
Revision: ba3d8905f93aaefea89e0f13a95f4ed2749563f5
Repository: https://gerrit.osmocom.org/osmo-ggsn
  • origin/master
Changes
  1. Bump version: 1.12.0.37-cf65-dirty → 1.13.0 (details)