Skip to content
Started 16 days ago
Took 4 min 29 sec on built-in

#79 (Apr 30, 2024, 11:10:57 AM)

Changes
  1. gateware: Rework the low-level line state monitoring ticks (details)

Started by upstream project gerrit-osmo-e1-hardware build number 71
originally caused by:

This run spent:

  • 7.9 sec waiting;
  • 4 min 29 sec build duration;
  • 4 min 37 sec total from scheduled to completion.
Revision: 40ccb4e3a385f7b56ac59cda8e9aebba84fa70bc
Repository: ssh://jenkins@gerrit.osmocom.org:29418/osmo-e1-hardware
  • master